December 15, 2017

You will need a SAP calculation for residential buildings at Design Stage and when the construction is complete.

Making changes during the build can impact the final calculation, and with ever-stricter emission targets to cope with, getting the specification right on yo...

December 7, 2017

So this is what the UK's 'ideal home' looks like, calculated from a survey of 2000 people taken from Go Compare, which was then generated into a CGI.(Computer G

December 5, 2017

Eco SIPs Homes design team take on the role of ’Panel Designer’, the design team will be responsible for the Health & Safety during design of the ‘SIP Package’ that forms the basis of any quotation we issue and will work closely with the ‘Principle Designer’ and ‘Princ...

Please reload

Featured Posts

The Septic Tank Regulations You Need to Know

November 28, 2018

1/5
Please reload

Recent Posts

January 24, 2018

Please reload

Archive
Please reload

Search By Tags
Follow Us
  • Twitter Social Icon
  • Facebook/ecosipshomes
  • LinkedIn/ecosipshomes